Your place:Home Programme

1、The second period Technical Transformation Project of Jiulongpo Port
     Chongqing Gangjiu Co.,Ltd. Jiulongpo Branch located at the west part of Chongqing City, it's the biggest hub of land and water communications in the upper reaches of Yangtze River and a key gateway to the coastal areas, it has become one of the most important ports for domestic and foreign trade in Southwest of China. After the first period of technical transformation, the handling capacity of the port has run up to 3.35 million tons. But because Jiulongpo Port has no special container quays, containers have to pass through the temporary bulk quay, and the cost is too high, operation sequence is too complex.  With the deepening of the reform and opening to the outside world, and the enforcement of the 9th Five-year Plan, it brings new opportunities and rejects vigor to the economy development of West China, and it also makes greater demands on the port. To speed up the development of Chongqing's economy, and to put an end to the backwardness of the container transportation in the upper reaches of Yangtze River, and to make full use of the sound  geographic vantage and building conditions,  Chongqing Gangjiu Co.,Ltd. has mapped out a programme for the second period technical transformation of  Jiulongpo Port. The project would be built at the lower reaches of the coaling quay (which had been finished at the first period). It would build a container quay with its annual handling capacity of 50 thousand TEUs, and a bulk quay with its annual handling capacity of 30 thousand tons. After the technical transformation, it would play an active role in the perfection of the infrastructures, and the improvement of its freight handling capacity. At the same time, it would play a remarkable role in the economy prosperity of Chongqing municipality and other cities around. 
     The fixed assets investment of the project is 191.3 million RMB yuan, and needs circulating fund 25 million RMB yuan, it would all be collected through fund raising. When the project finished, the income of the company would account for 40.38 million RMB yuan, and the after-tax-profit would attain 18 million RMB yuan, The investment payback time would be among 8 years. The project has been approved by the Ministry of Communication through the NO.[1997]319 File.
2、The Bulk Quay Rebuilding Project
     The bulk Quay In Jiulongpo Branch of Chongqing Gangjiu Co.,Ltd. possesses the largest and longest operation line in the upper reaches of Yangtze river, the ultimate elevating capacity is 180 tons,  it had consecutively transported large set of equipments for various chemical factories.  In keeping with the construction of the Three Gorges Project and the economy development of Southwest China,  it makes greater demands on the transportation of heavy and oversize cargos. Especially, because of the Three Gorges Project, it need to safely transport 26 sets of 350-ton large transformers of Chongqing Transformer Co.,Ltd. to the worksite in time. To ensure the project go on without a hitch, the company drew up a plan to rebuild the former bulk quay in Jiulongpo Branch.  According to the requirements, the heavy-cargo  operation line would be rebuilt into a large one with its handling capacity amount to 400 tons. At present, the handling capacity of the ports in the upper reaches of Yangtze River is too weak, and many heavy cargos have to been transported by disassembling them into small ones, the efficiency is too low and the cost is too high.  The rebuilding of the bulk quay would  speed up the transportation and reduce the cost. It would also promote the economy development of this area, and create a new point of profit growth.
     The fixed assets investment of the project is 54 million RMB yuan, and needs circulating fund 12 million RMB yuan, it plans to collect fund through issuing stocks. When the project finished, the income of the company would account for 18 million RMB yuan, and the after-tax-profit would attain 8 million RMB yuan, The investment payback time would be among 8 years. The project has been approved by Chongqing Planning Commission through the [1998]192 File.   

Chongqing Gangjiu Co.,Ltd  All Rights Reserved
E-mail:cqgj@cqgj.com.cn